Is your ballasted rubber roof at the end of its life? In this project video, Insulated Roofing Contractors (IRC) replaces a 150,000-square-foot ballasted EPDM roof with a mechanically fastened TPO membrane, completing the entire commercial reroof in less than 30 days.
Step 1: Remove the ballast
Ballasted EPDM roofs are held down by tons of loose river rock. Our crews removed all of the stone to expose the old rubber membrane underneath.
Step 2: Tear off the old rubber membrane
With the ballast gone, the aging EPDM was removed down to the substrate, giving us a clean surface to build the new roof system on.
Step 3: Install mechanically fastened TPO
The new TPO membrane was mechanically fastened to the roof deck. TPO's heat-welded seams create a strong, watertight bond, and its white, reflective surface helps lower cooling costs.
Why replace ballasted EPDM with TPO?
Less weight on your structure. Removing the rock takes significant load off the building.
Easier leak detection. With no ballast covering the membrane, problems are easy to spot and repair.
Stronger seams. Heat-welded TPO seams outperform the taped or glued seams on older rubber roofs.
Energy savings. A reflective TPO roof reflects sunlight instead of absorbing heat.
Large-scale reroofing, done fast
Finishing a 150,000-square-foot reroof in under 30 days takes experienced crews and tight project management. With 120+ crews nationwide, IRC has the capacity to complete large commercial roof replacements quickly while keeping your building running. Contact IRC to get a quote on your roof replacement.